CYP500

According to the Medium-and long-term Railway Network Plan, China will build 12,000 km of new passenger dedicated lines and intercity railways by 2020, with about 16,000 km planned. It is necessary to need multiple sets of seamless line laying equipment, independent development of suitable for China’s national conditions, high efficiency, high performance, easy operation, easy maintenance, low cost, low fault rate of new seamless line laying equipment is imperative, in order to meet the needs of China’s railway laying seamless line. In order to meet the needs of users, our company has investigated various types of rail laying machines at home and abroad, and independently developed the CYP500-type group pillow long steel rail laying unit together with China Railway No.2 Bureau Group Co., LTD. The operation mode of the rail laying unit adopts the group pillow method, and the whole machine moves forward, and the operation mode of receiving the track into the rail trough forms the rail line. Compared with the single pillow method, the difference is that the cloth pillow method is laid by multiple sleepers at the same time, and it is the operation mode of sharing the pillow and then laying the pillow. The equipment is composed of long rail tractor, main engine, auxiliary machine, pillow rail transport vehicle group, sleeper carrier and power and hydraulic system, electrical control system and other parts.

Basic Size:

Parameter
Unit
Value
Total Length Of Unit
m
About 569 (Operating Status)
Maximum Width Of The Unit
mm
3400
Maximum Height of the Unit
mm
4730
Gauge Distance
mm
1000–1435

Main Performance:

Parameter
Unit
Value
Job Mode
Group Pillow Stepping Operation
Operation Traction Mode
Crawler Traction Device And 6 Power Shafts Combined Control Traction
Total Power System
kW
(273 + 75) 348
Traction Weight
t
2500 (On 12 ‰ Ramp)
Type Of Laying Sleeper
Type Pillow
Lay Rail Type
kg/m
60
Type Of Paved Bed
Ballast And Ballastless
Unit Weight
t
About 1020 (Including 37 Flat Cars, Sleeper Carriers And Transportation Support)
Total Weight Of Vehicle Group At Full Load
t
About 2,460
Lay Rail Length
m
12–500
Minimum Operation Radius
m
400
Operation Climbing Capacity
%
12
Running Speed During Rail Laying
m/min
0–7.5
Average Cloth Pillow Speed
Roots/min
6–10 (14 Roots Per Row)
Recital Spacing Error
mm
±10
Track Deviation From Line Center Line Error
Sleeper Spacing Adjustment
m
500–800
Maximum Radius Of Curvature
m
180
Operating Environment Temperature
-20 ~ +50
Operating Wind Force
N/m²
150 (Grade 6)
Non-Operating State Withstand Wind Force
N/m²
800 (Class 11)
Operation Altitude
m
2000
Lighting Conditions
Meet The Night Operation Conditions
Comprehensive Operation Efficiency Limit
km/12h
2
Unit Under Transfer Condition
Meet The Requirements Of Secondary Overlimit